This week the carpentry team was busy finishing the walls in the timberframe part of the house, and building the insulated roof. Meanwhile, the excavating team was busy building the permanent driveway which required a lot of fill to be brought in to achieve the correct elevations. We were excited to drive down the driveway this weekend. The firt picture shows the house viewed from the garage end looking into the mudroom and kitchen(garage not yet built), while the other 2 pictures show the view looking down the new driveway, with our car parked at end of drive!
Monday, May 31, 2010
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment